Warning: Cannot modify header information - headers already sent by (output started at /websites/da/dairyconstructions.com.au/index.php:7) in /websites/da/dairyconstructions.com.au/wp-includes/feed-rss2.php on line 8 Feedpad | Dairy Constructions
http://dairyconstructions.com.au
Australia's leading dairy builderFri, 30 Mar 2018 22:48:21 +0000en-UShourly1https://wordpress.org/?v=4.9.7Union Station
http://dairyconstructions.com.au/?project=union-station
Sat, 10 Sep 2016 03:58:37 +0000http://dairyconstructions.com.au/wordpress/?post_type=project&p=1111
]]>The Midfield Group
http://dairyconstructions.com.au/?project=midfield-feedpad
Thu, 23 Jun 2016 06:30:58 +0000http://dairyconstructions.com.au/wordpress/?post_type=project&p=850
The Midfield Group - Feedpad
700 Cow Feed Pad Infrastructure – Cooramook, Victoria
700 cow drive-thru feed pad incorporating dimensional requirements for conversion to 700 cow free stall barn. Integrated head-locks, cattle grids, cross-overs, turn tables and separate animal / vehicle access form part of the initial design brief.
Crucial to the construction of any feedpad facility is the initial design and planning phase as the slightest miscalculation in heights, falls, levels, spacing’s and drainage can render any feed pad ineffective. This project required meticulous planning and set out to ensure tight integration with delivery of the entire dairy facility.
This high specification feed pad has delivered the Midfield Group the flexibility to manage their growing herd whilst minimising feed wastage, paddock damage and wash down requirements. Additional benefits to the Midfield Group are better feed intake, improved pasture utilisation and increased milk production.